ASSEMBLING INSTRUCTION
Earth Fault and Short Circuit Indicator Type EKL4
(Panel instrument)
Descrition
The earth fault and shot circuit indicator consists of:
l 1 pc reading instrument (panel instrument)
l 3 pcs sensors for detecting short circuit current
l 4 pcs linght cable
l 1 pc sensor for observing the sum current
l 1 pc flashing lamp (optional)
Installation of the reading instrument
The Earth Fault and Short Circuit Indicator is designed for panel installation .The necessary dimensions of the cutout are 91.5+0,6x44.5+0,6mm ( refer to figure 2 ) .Before sliding in the instrument , the electrical connections can be accomplished .The housing is slded into the opening and pushed with a light pressure up to stop position .Springs ( figure l ) serve to keep the reading instrument in its position .
Installation of the light cable
The sensor which is installed on the cable,is connected to
the reading instrument via light cable.Therefore the sensor
of core L 1has to be connected with the terminal L1 on the
back of the reading instrument.(The endings of the light
cables have to be pushed into the pick-up openings up to
stop position.)The same has to be done with the Sensors L2,
L3 and the earth fault sensor 14(figure 3).
Power supply
The power supply is performed via a 3.6 V lithium
battery.For exchanging the battery,a screw cap
on the front side of the indication housing must
be removed by turning it left.The battery must be
taken out and replaced by a new one.(With the
supply via lithium battery,the 230 VAC are only
connected in case the erath fault and short circuit
indicator type EK shall be reset also via recovering
voltage of the net.)
Electric connection
Depending one the version,the electrical connection has to be done according to the designations in figure 3.
Terminals without any marking(NC)are without any function.In principle,the information indicated on the reading instrument is valid.
Setting the display time
The time of displaying after a short circuit or earth is
adjustable.
There are three times to choose.The standard reste times are:1-2
-4h(other values are possible).The adjustment of the reset times
will be done by a rotaryswitch.The rotary switche is on the front
side of the indicator in the left top corner.The possible switch
positions are shown if figure 4.
Setting the operating points for short circuit
The adjustment of the operating points of the earth fault and shore circuit indicator indicator type EKL4 is done at the sensors.Three different operating points can be adjusted.The operating points are adjusted with a rotary switch at the front side of the sensor.The adjustable operating points are indicated on the front side of the sensor.
- 旭旺电力:紧跟顶尖科技 创造一流精品旭旺电力:紧跟顶尖科技创造一流精品http://www.electric.hc360.com20...
- 电缆型故障指示器说明书EKL-2型短路光闪故障指示器技术说明书使用说明书广州旭旺电力科技有限公司...
- 2012电气30强海选 旭旺电力一路领先2012电气十大30强海选旭旺电力一路领先2012电气十大评选正在进行30强海选投票的激烈争夺中,...
- 慧聪网2012年创新电气企业评选 慧聪网2012年十大创新电气企业评选活动中“广州旭旺电力科技有限”公司已经名...
- 故障指示器简史电力线路故障指示器起源于二十世纪八十年代的德国,发明它的目的是为了指示电力线路短路电流流过的途径,...