1. | specify any modifications or changes to our specifications and conditions requested per rfq | | | | | | | | | | | |
2. | your price must includes any quality documents requested in the rfq | | | | | | | | | | | | | | | | |
3. | any exceptions to rfq must be detailed separately. | | | | | | | | | | | | | | | | | | | |
4. | please quote alternative designs, material, specifications separately. | | | | | | | | | | | | | | | | |
5. | all tooling/fixtures/gages/etc. are the property of technocrates inc. and should be physically identified on the property as such. | | | |
6. | tooling/fixtures/processes must be statistically capable and prevent any damage to product during handling. | | | | | | | |
7. | error proofing tooling/fixtures must be supplier"s responsibility. | | | | | | | | | | | | | | | | | |
8. | all information mentioned in the quotation is confidential. it should be returned if supplier is not chosen for the project. | | | | | | |
| informations include drawing, specification, samples or any kind of information furnished by technocrates. | | | | | | | |
9. | quote will be accepted only if this form is completed. |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | |