产品详细介绍

用途 风力发电机控制

简 介

济南德明电源设备有限公司是一家专业从事电源设备设计制造的企业。主要产品有离网风力发电机控制器、并网风力发电机控制器、太阳能控制器、风光互补控制器、风光互补路灯控制器、逆变器等。在20多年的发展实践中,我企业根据蓄电池、风力发电机、太阳能电池板的特性,依照国家有关标准,自主研发出各类功能齐全、性能稳定、保护功能完善的系列产品。产品质量保证体系完善,实行全面、全员、全过程的质量控制,出厂前逐台严格测试,各项性能优于国家有关标准,确保用户安全,可靠使用。

overview
jinan deming power e co., ltd. specializes in the design & manufacture of power e. its main products includeoff-grid wind turbine controller,grid-tiewind turbine controller, solar energy controller, wind-solar hybrid controller, wind-solar hybrid lamping controller and inverter, etc. during the development practice of more than 20 years, in accordance with the characteristics of the wind turbine generator and solar panel, our company has developed the product series featuring well-round function, stable performance and perfect protection function. the product boasts of perfect guarantee system, with control adopted in each aspect of the production process. each set is strictly tested before delivery, with properties superior to relevant national standard, to ensure safety and reliability for customers.

fkj-gt(并网)型产品特性

◆本产品参照jb/t6939.1-2004号行业标准,gb/t19115.1-2003号国家标准生产,也可根据用户技

术要求生产。

◆采用两套控制系统,pwm恒压系统+三相卸荷系统。

◆ pwm恒压控制是风力发电机额定功率的120%。当超出pwm恒压功率范围时,三相卸荷立即启动运行,运行10-20分钟停止三相卸荷,风力发电机恢复供电,保证风力发电整套系统安全运行。

◆在大风、强风情况下,控制器恒压输出,保证逆变器正常工作。

◆在并网逆变器掉线情况下,控制器恒压输出,等待逆变器恢复工作。

◆当电网停电时,控制器三相卸荷自动启动,逆变器停止向电网输出。待网电恢复供电时,控制器停止三相卸荷,逆变器恢复供电。

◆控制器根据风力发电机的种类,可增加机械偏航控制、机械折尾控制、机械或液压、气压、电磁,等多种制动控制功能。

◆控制器内部设有防雷器。把窜入风力发电机电力线的瞬时过电压限制在设备或系统所能承受的电压范围内,或将强大的雷电流泄流入地,保护设备不受雷电冲击而损坏。

◆ led灯状态指示。前面板有风力发电机指示、卸荷指示、三相卸荷延时指示、欠压指示、网电指示,及直流输出电压指示。

◆电压表指示。指示控制器dc输出电压。

◆控制器具有急停开关,遇紧急情况时,按下前面板急停按钮,控制器全部电源切断,风力发电机立即三相卸荷。

◆控制器具有手动三相卸荷开关,用户可根据情况使用。使用此开关,风力发电机将强制性三相卸荷。

fkj-gtgrid-tiemodel product characteristics

◆the product is manufactured according the jb/t6939.1-2004 industrial standard and gb/t 19115.1-2003 national standard also with users’ technical re

◆two sets of control systems:pwm constant voltage system and three-phase dump load system.

◆pwm constant voltage control is 120% of the rated power of the wind turbine. in case exceeding of pwm’s capacity, the three-phase dump load will automatically startimmediately. after 10-20 minutes, the three-phase dump load will stop and the wind turbine will re-start to resume power supply to ensure the safe running of the overall wind turbine generation system.

◆under the strong or super-strong wind conditions, the controller can conduct constant voltage output to ensure the inverter safety running.

◆under the condition of disconnected grid-connected inverter, the controller can conduct constant voltage output and wait for inverter resumption.

◆the three-phase dump load of the controller will automatically start and the inverter will stop grid output when the power grid is off. as soon as the grid power resuming, the controller stops three-phase dump load and the inverter will resume power supply.

◆for the different wind turbine generator type, the controller can be e with mechanical yawing,furled empennage,mechanical or hydraulic, pneumatic, electric magnetic and other brake functions.

◆the inside of the controller is e with surge arrester.contain the over voltage into the wind turbine under the bearable voltage of the e or system. on another way, to conduct the strong lightening current into the earth directly to avoid any damage of e.

◆the below led status indication can be found onthe front panel: indications of wind turbine, dump load, three-phase dump load delay time, under pressure, grid power and dc output voltage.

◆voltmeter indication: indicate the controller dc output voltage.

◆the controller is e with emergency stop switch; in case of emergency, press down the emergency stop button in the front panel to cut off all power supply of the controller and the wind turbine will immediately carry out three-phase dump load.

◆the controller is e with manual three-phase dump load switch. to using this switch, the wind turbine will carry out three-phase dump load forcibly.

fkj-gt型并网风力发电机控制器技术参数(1)

technical parameters of thefkj-gt modelgrid-tie wind turbine controller (1)

型号type

2kw

3kw

5kw

功能function

整流、控制rectifier ,control

工作环境operating environment

温度-10-40℃,湿度≤80%

temperature -10-40℃,humidity≤80%

pwm恒压电压pwm constant voltage

≥270vdc

≥380dc

≥380vdc

风力发电机三相卸荷动作电压

3-phase dump load voltage of the wind turbine

300±5vdc

410±5vdc

410±5vdc

风力发电机三相卸荷延时

time-lapse of the wind turbine 3-phase dump load

12-20分钟

12-20 min

12-20分钟

12-20 min

12-20分钟

12-20 min

欠压指示low-voltage

≤200vdc

≤200vdc

≤200vdc

pwm卸荷保险pwm dump load fuse

10a

10a

16a

直流输出保险fuse of dc output

16a

16a

20a

控制器尺寸size of the controller

500*460*330 mm

500*460*330 mm

500*460*330mm

控制器重量weightof the controller

18.3 kg

19 kg

20 kg

卸荷器尺寸size of the dump load

660*320*320 mm

660*320*320 mm

660*510*450mm

卸荷器重量weightof the dump load

18kg

19 kg

28.5 kg

以上参数仅供参考1.可依据用户技术要求定制。2.可依据用户需求增加太阳能控制。

※above parameter only for reference

1. could be custom made to user specifications. 2. could have solar power control subject to user demand.

fkj-gt型并网风力发电机控制器技术参数(2)

technical parameters of thefkj-gt modelgrid-tie wind turbine controller (2)

型号type

10kw

20kw

功能function

整流、控制rectifier ,control

工作环境operating environment

温度-10-40℃,湿度≤80%

temperature -10-40℃,humidity≤80%

pwm恒压电压pwm constant voltage

≥480vdc

≥480vdc

风力发电机三相卸荷1动作电压

3-phase dump load voltage 1 of the wind turbine

560±5vdc

560±5vdc

风力发电机三相卸荷2动作电压

3-phase dump load voltage 2 of the wind turbine

----

570±5vdc

风力发电机三相卸荷延时

time-lapse of the wind turbine 3-phase dump load

12-20分钟

12-20 min

12-20分钟

12-20 min

欠压指示low-valtage

≤200vdc

≤200vdc

pwm卸荷保险pwm dump load fuse

32a

63a

直流输出保险fuse of dc output

40a

80a

控制器尺寸size of the controller

570*550*330 mm

570*550*330 mm

控制器重量weightof the controller

27 kg

30 kg

卸荷器尺寸size of the dump load

770*550*460 mm

810*580*980 mm

卸荷器重量weightof the dump load

35 kg

77 kg

※以上参数仅供参考1.可依据用户技术要求定制。2.可依据用户需求增加太阳能控制。

※above parameter only for reference

fkj-gt型并网风力发电机控制器技术参数(3)

technical parameters of thefkj-gt modelgrid-tie wind turbine controller (3)

型号type

30kw

功能function

整流、控制rectifier ,control

工作环境operating environment

温度-10-40℃,湿度≤80%

temperature -10-40℃,humidity≤80%

pwm恒压电压pwm constant voltage

≥560vdc

风力发电机三相卸荷1动作电压

3-phase dump load 1 voltage of the wind turbine

600±5vdc

折尾动作电压fold empennage voltage

610±5vdc

折尾延时time-lapse offold empennage

3分钟min

风力发电机三相卸荷2动作电压

3-phase dump load 2 voltage of the wind turbine

620±5vdc

风力发电机三相卸荷2延时

time-lapse of the wind turbine 3-phase dump load 2

12-20分钟

12-20 min

欠压指示low-valtage

≤200vdc

pwm卸荷保险pwm dump load fuse

63a

直流输出保险fuse of dc output

80a

控制器尺寸size of the controller

570*550*330mm

控制器重量weightof the controller

32kg

卸荷器尺寸size of the dump load

810*590*1405mm

卸荷器重量weightof the dump load

140kg

※以上参数仅供参考1.可依据用户技术要求定制。2.可依据用户需求增加太阳能控制。

※above parameter only for reference

所属分类:中国电子元件网 / 稳压器(恒压变压器)
本页链接:http://product.11467.com/info/1041734.htm
PWM并网风光互补控制器(2KW-20KW)的文档下载: PDF DOC TXT
关于济南德明电源设备有限公司商铺首页 | 更多产品 | 联系方式 | 黄页介绍
主要经营:风力发电机控制器 ; 风光互补逆变控制器 ; 逆变电源 ; 稳压电源 ; 风力发电机电源 ; 太阳能控制器
济南德明电源设备有限公司是专业从事电源设备生产的高新技术企业。主要生产风力发电机控制器、并网风力发电机控制器、并网逆变器、风力发电机逆变控制器、风光互补逆变控制器、逆变电源、稳压电源、UPS电源等电源 ...
我们的其他产品
顺企网 | 公司 | 黄页 | 产品 | 采购 | 资讯 | 免费注册 轻松建站
免责声明:本站信息由企业自行发布,本站完全免费,交易请核实资质,谨防诈骗,如有侵权请联系我们   法律声明  联系顺企网
© 11467.com 顺企网 版权所有
ICP备案: 粤B2-20160116 / 粤ICP备12079258号 / 粤公网安备 44030702000007号 / 互联网药品信息许可证:(粤)—经营性—2023—0112